Home > Method > Installation quidelines
 

- Sub-floor to be installed must be heated for 7~14 days if heating system is available.
If not, allow sufficient time to dry out all moisture.

Temperature in space to be installed must be maintained at 18℃ or above, before and during installation.

Tile and adhesives must be kept in the same place for at least 24 hours before installation.
Prior to installation, please check that the tiles are the same batch and use our designated adhesives only.

Install in the same direction in accordance with the marks(↑) on the reverse side for prevention of differences in color& stabilities in dimensions.

Please press the floor sufficiently by roller (more than 50Kg) after installation.

 

- All pollutants like water, grease, sand and other foreign materials must be removed to avoid slipperiness, especially, for children, the aged and the pregnant women.

Please ventilate the installed space sufficiently early after installation due to the peculiar odour of adhesives.

Keep the tiles on the flat surface to keep it from warping and avoid snow, rain and direct rays of the sun.

For some heavy stains partially, please mop up with a neutral detergent or alcohol.
Do not use strong solvent such as acetone, etc for cleaning.

Before the sufficient hardnening of the adhesive, abrupt changes in temperature by cooling or heating on the job site can cause instabilities of dimensions, which may result in curling up or contraction of the installed tiles.

Be cautious in handling or carrying this products because of heavy goods.

When using adhesives, please ventilate throughly to prevent fire and health trouble of worker.

Please dispose scraps through an authorized industrial waste disposal company contact due to toxic gas when burnt.